3D Modelling in Inlet Area

Project Information

Client

EPC company

Software

Aveva E3D, Autocad, Navis works

Category

Oil & GAs

Project Duration

8 Weeks

Location

UAE

Description

Client

A UAE-based EPC company after PFD and plot plan with P&ID developed model inlet area.

Engineering Requirement

ADS Design Engineering team developed the 3D model for all the types of equipment and piping assembly along with the pipe support and complete fabrication package for all the aboveground piping for two sites.

Delivered

Want to know more about this project?